HVAC Mechanical & Electrical Components

With over 20 years experience throughout the team being heavily involved with the 
R&D and production of high end close control AC equipment for leading European and Asian Close control Air Conditioning equipment manufactures, the ASC team has all the experience needed to low cost source in line Mech / Elec Refrigeration, Water and electronic components that can be exactly duplicated or alternatively sourced without compromise.

HVAC Components

With over 20 years experience throughout the team being heavily involved with the R&D and production of high end close control AC equipment for leading European and Asian Close control Air Conditioning equipment manufactures, the ASC team has all the experience needed to low cost source in line Mech / Elec Refrigeration, Water and electronic components that can be exactly duplicated or alternatively sourced without compromise.

HVAC Mechanical & Electrical Components

With over 20 years experience throughout the team being heavily involved with the R&D and production of high end close control AC equipment for leading European and Asian Close control Air Conditioning equipment manufactures, the ASC team has all the experience needed to low cost source in line Mech / Elec Refrigeration, Water and electronic components that can be exactly duplicated or alternatively sourced without compromise.
Please note that where IP or copyright does exist, full legal ownership MUST be demonstrated through owners copies of their application approval documentation.
On clearing legal right of way, full technical and manufacturing documentation, samples and test method statements including design figures MUST be supplied to ensure 1st off ASC samples are ‘right first 
time’ and no further samples or 
testing is required to achieve design specification. Your target price is also needed for ASC evaluation to determine cost savings prior to any production works or sourcing is carried out. 

Please note that where IP or copyright does exist, full legal ownership MUST be demonstrated through owners copies of their application approval documentation.
On clearing legal right of way, full technical and manufacturing documentation, samples and test method statements including design figures MUST be supplied to ensure 1st off ASC samples are ‘right first time’ and no further samples or testing is required to achieve design specification. Your target price is also needed for ASC evaluation to determine cost savings prior to any production works or sourcing is carried out. 

Share by: